INSTALLATION IN THREE STEPS

1. CHOOSING A PLACE ON THE WALL

10 MINUTES

  • selecting a flat section of the wall (determined visually);
  • choose a location taking into account the dimensions of the device and minimum margins;
  • checking the absence of utilities in the wall: wires, heating pipes, water supply, etc.

2. DRILLING A HOLE

30 MINUTES

  • laying an air duct using a diamond drilling unit, including finishing;
  • collection of drilling products (water, dust) using a drainage collector and an industrial vacuum cleaner;
  • observe the downward angle of the air duct channel by 3-5° so that precipitation falling into the channel flows towards the street.

3. FINAL WORK

20 MINUTES

  • heat and noise insulation of the air duct channel, sealing the joints of the heat and noise insulating pipe and the wall;
  • installation of a decorative grille on the facade of the room to protect against insects, fluff, and debris from the street getting into the air duct;
  • hanging the breather on the anchor bolts and ensuring tight press to the wall.

VIDEO INSTALLATION